<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel xmlns:atom="http://www.w3.org/2005/Atom"><title>Ennis Builders &amp; Realtors</title><link>http://www.ennisteam.com/blog/rss/feeds</link><description>Homebuilder and Commercial Contractor plus a Real Estate Brokerage with Realtors.  Land Development, Affordable Homes, Custom Homes, Multi-Family, and Realtors helping Buyers and Sellers.  Commercial Construction.</description><atom:link href="http://www.ennisteam.com/blog/rss/feeds" rel="self" type="application/rss+xml" /><lastBuildDate>Mon, 26 Oct 2026 16:06:19 -0700</lastBuildDate><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/california-adu-laws-in-2026-explained-simply</guid><link>http://www.ennisteam.com/blog/post/california-adu-laws-in-2026-explained-simply</link><title>California ADU Laws in 2026, Explained Simply</title><description>
California ADU Laws in 2026, Explained Simply
Last updated: October 2026
Short answer: In 2026, most California homeowners with a single-family or multifamily home can build an ADU by right. That means the city has to approve it if it meets objective written standards, with no public hearing. State law allows a detached ADU of up to 1,200 sq ft, generally requires only 4-foot side and rear setbacks, bans impact fees on ADUs with 750 sq ft or less of interior space, and doesn't require you to live on the property. New this year: SB 543 measures ADU size by interior living space and waives school fees at 500 sq ft or less, and AB 1154 lets you rent out a junior ADU without living there, as long as it has its own bathroom.
Here are the rules homeowners ask us about most, in plain English.
The rules at a glance




Question
2026 California rule




Can my city say no?
Not if your ADU meets the objective written standards. Approval is "ministerial," with no hearing or design-review vote.


How long does approval take?
The city must act within 60 days of a complete application. Under SB 543, it must tell you within 15 business days whether your application is complete.


How big can it be?
Detached: up to 1,200 sq ft, and cities must allow at least 800 sq ft. JADU: up to 500 sq ft. Size is measured as interior living space.


How tall?
Generally 16 ft for a detached ADU, more in some cases (see below). Attached ADUs can go up to 25 ft or the zone's height limit.


Setbacks?
4 ft from side and rear property lines. A converted existing structure can keep its current setbacks.


Impact fees?
None at 750 sq ft or less. Above that, fees are proportional to the size of your main home.


School fees?
None at 500 sq ft or less (new under SB 543).


Do I have to live there?
No for ADUs. For JADUs, only if the JADU shares a bathroom with the main house (AB 1154).


Can I rent it?
Yes, long-term. Cities can require ADU rentals to be longer than 30 days. JADUs can't be short-term rentals.


Parking?
Often not required, including near public transit. Converting a garage doesn't require replacement parking.




1. Can I build an ADU on my property?
If you have an existing or proposed home on a lot zoned for residential use, the answer is usually yes. State law doesn't allow a minimum lot size for a standard ADU. The real limits are physical: room for 4-ft setbacks, access for construction, and how utilities reach the unit. That's why we always start with a lot review.
2. How many ADUs can I have?

Single-family lot: SB 543 confirms you can combine a converted ADU, a detached ADU, and a junior ADU on one single-family lot.
Multifamily property: You can convert non-living space such as garages, storage rooms, and attics into ADUs. The number of converted ADUs can be up to 25% of the existing units, and at least one. You can also add up to 8 detached ADUs, but no more than the number of existing units.

3. How big and how tall?

Detached ADUs can be up to 1,200 sq ft. Your city can set its own limits, but it must allow at least 800 sq ft.
Attached ADUs are generally capped at 50% of the main home's size, but cities must still allow at least 800 sq ft.
JADUs must be 500 sq ft or less and sit inside the walls of the main house.
SB 543 changed how size is measured. Square footage now means interior living space. Exterior walls, outside stairs, covered patios, and roof overhangs don't count. That can be the difference between landing under or over a fee limit.
Height: A detached ADU is generally capped at 16 ft. The cap is higher near major transit or on multifamily lots. Attached ADUs can go up to 25 ft or the zone's height limit, whichever is lower.

4. What about fees?

750 sq ft or less of interior space: no impact fees from the city, special districts, or water companies.
500 sq ft or less: no school fees either. This is new in 2026.
Over 750 sq ft: impact fees can be charged, but only in proportion to your main home's size.
You'll still pay building permit and plan-check fees, and usually sewer and water connection fees.

Why this matters: our ADU 495 is designed to come in under 500 sq ft, and seven of our plans stay at or under 750 sq ft. Designing to these limits can save you thousands. 
5. Do I have to live on the property?
Not for an ADU. A 2023 law, AB 976, permanently banned cities from requiring owners to live on a property with an ADU. You can rent out both the main house and the ADU.
For a junior ADU, AB 1154 (2026) says you must live on site only if the JADU shares a bathroom with the main house. Give the JADU its own bathroom, and you no longer have to live there to rent it out.
6. Can I rent it out?
Yes. Long-term rentals are allowed statewide. Cities can require ADU rentals to last longer than 30 days, which effectively bans Airbnb-style rentals, and many do. Under AB 1154, JADUs can't be rented short-term anywhere. Check your city's rules before planning a short-term rental.
7. Do I need solar or fire sprinklers?

Solar: California's energy code generally requires solar on new detached ADUs. Garage conversions and other conversions are usually exempt because they count as alterations, not new construction.
Fire sprinklers: You don't need them in the ADU if they aren't required in the main house. SB 543 extends this rule to JADUs.

8. What about parking?
Many ADUs need no new parking. State law bars parking requirements when the ADU is within a half-mile walk of public transit, and in several other situations. If you convert a garage, the city can't make you replace those parking spaces.
9. Will an ADU raise my property taxes?
Only the new construction is assessed. Your existing home keeps its current tax base. For example, a $200K ADU adds roughly the tax on $200K in value, not a reassessment of your whole property.
10. Can I sell the ADU separately?
Generally, no. An ADU stays part of your property. A few cities have chosen to allow condo-style ADU sales under a newer state option, but that's rare and comes with extra requirements.
The catch: your city still matters
State law sets the floor, but each city writes its own ADU ordinance on top of it, covering design standards, fee schedules, and its approval process. Cities update these often, and some details are site-specific, like sewer capacity in Anaheim or coastal permits along the OC coast. We confirm the rules for your exact address before you spend a dollar on design.
Frequently asked questions
What's new in California ADU law for 2026? SB 543 measures ADU size by interior living space, exempts ADUs of 500 sq ft or less from school fees, confirms you can combine a detached ADU, a converted ADU, and a JADU on one single-family lot, and gives cities 15 business days to say whether an application is complete. AB 1154 drops the owner-occupancy requirement for JADUs with their own bathroom and bans short-term rentals of JADUs.
Can my HOA stop me from building an ADU? California law generally bars HOAs from prohibiting or unreasonably restricting ADUs on single-family lots. They can still apply reasonable design rules.
Do I need an architect? Not always. We're a design-build team, so design, permitting, and construction are handled under one contract.
Want to know what fits your lot?
We'll check your city's rules, measure your lot, and show you which plans fit, at no cost. Call or text (559) 788-1000 or contact us. We build across the Central Valley and in Orange County. Browse ADU plans.
Ennis Builders &amp; Realtors &amp;middot; CSLB #950391 &amp;middot; DRE #01888871. This article is a general summary of California ADU law as of October 2026. It is not legal advice. Local ordinances and site conditions vary, so confirm the rules for your property with your city or with us before you build.
Sources: California HCD &amp;mdash; ADU resources &amp;middot; SB 543 bill text &amp;middot; Best Best &amp; Krieger &amp;mdash; Governor signs four new ADU bills &amp;middot; Lozano Smith &amp;mdash; SB 543 summary</description><pubDate>Tue, 06 Oct 2026 16:19:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/how-much-does-an-adu-cost-in-the-central-valley-2026-prices</guid><link>http://www.ennisteam.com/blog/post/how-much-does-an-adu-cost-in-the-central-valley-2026-prices</link><title>How Much Does an ADU Cost in the Central Valley? (2026 Prices)</title><description> 
How Much Does an ADU Cost in the Central Valley? (2026 Guide)
Short answer: The cost of an ADU in the Central Valley comes down to four things: its size, your site, your utility connections, and the finishes you choose. City fees add to that, but they're usually a small part of the total here. A 627 sq ft ADU in Porterville ran about $5,700 in total city fees. California law also waives impact fees on ADUs with 750 sq ft or less of interior space, and school fees at 500 sq ft or less. The fastest way to get a real, current number is a free lot review.
Building costs move, so we don't post one-size-fits-all prices. We price your plan for your property. Here's what goes into that number and how to keep it down.
Our ADU plans




Plan
Size
Beds / Baths
Fee advantage




ADU 256
256 sq ft
1 / 1
No impact or school fees


ADU 360
360 sq ft
1 / 1
No impact or school fees


ADU 483
483 sq ft
1 / 1
No impact or school fees


ADU 495
495 sq ft
1 / 1
No impact or school fees


ADU 612
612 sq ft
1 / 1
No impact fees


ADU 645
645 sq ft
2 / 1
No impact fees


ADU 730
730 sq ft
2 / 2 (two-story)
No impact fees


ADU 784
784 sq ft
2 / 1
Proportional impact fees


ADU 1200
1,200 sq ft
3 / 2
Proportional impact fees


ADU 1200 Two-Story
1,200 sq ft
3 / 2 (two-story)
Proportional impact fees




Fee exemptions are based on interior living space under California law. Your city's exact fees are confirmed during your lot review. See every plan on our ADU models page.
What changes the final price
Four things decide what your ADU actually costs:

Size. This is the biggest factor, and it's the one you control most directly. Every square foot adds cost, and crossing 500 or 750 sq ft can add fees.
Your site. A flat lot with easy access costs less than a sloped lot, a tight side yard, or a spot where equipment can't reach. That's why a phone quote isn't worth much: a price without a site visit is a guess.
Utilities. Water and sewer lines have to be trenched from the main house or the street to the ADU. A short run costs a few thousand dollars. A long run, or a sewer line that needs a pump because it can't drain downhill, costs more. Your electrical panel may need an upgrade, or the ADU may get its own meter.
Finishes. Cabinets, counters, flooring, and fixtures are where budgets swing the most. If you're building a rental, clean and durable finishes rent just as well as luxury ones.

City fees: what to expect
City fees in the Central Valley are usually a small part of the total. For example, a 627 sq ft ADU in Porterville ran about $5,700 in total city fees. That included plan check, trade permits, school fees, and a sewer treatment fee. Fee schedules change, and every city is different, so we pull the current numbers for your city before you commit.
California law also works in your favor:

750 sq ft or less of interior living space? No impact fees. State law bars cities and districts from charging impact fees on these smaller ADUs. Seven of our plans, from the 256 to the 730, fall under that line.
500 sq ft or less? No school fees either, under SB 543, which took effect January 1, 2026. Our 256, 360, 483, and 495 plans qualify.
Over 750 sq ft? Impact fees can apply, but only in proportion to the size of your main home, not a full new-house fee.

Other costs to budget for

Solar. California's energy code generally requires solar on new detached ADUs. Garage conversions are usually exempt.
Landscaping and fencing repair. Trenching and equipment access can tear up part of the yard.
Financing costs. If you borrow to build, interest usually starts during construction, before any rent comes in.

5 ways to lower your ADU cost

Stay at 750 sq ft or less of interior space to avoid impact fees, and stay at 500 sq ft or less to also skip school fees.
Keep the shape simple. A rectangle with one roofline costs less than an L or U shape.
Put the kitchen, bath, and water heater close together. Shorter plumbing runs mean less labor and material.
Go all-electric. Skipping a gas line usually saves you a trench, a meter, and extra inspections.
Place the ADU close to your existing water and sewer lines. Moving it a few feet can save thousands.

How long does it take?
Plan on about a year from design to move-in. Permitting is the biggest variable and depends on your city. Garage conversions can move faster. We give you a realistic schedule after we've seen your lot.
How to pay for it
Most homeowners use a home equity line of credit (HELOC), a cash-out refinance, or a construction loan. If your current mortgage rate is lower than today's rates, a HELOC usually makes more sense than refinancing your whole mortgage. Talk to a lender early. See our financing page to get started.
Why Ennis
We're a Porterville family company, and we're both the builder and a licensed real estate brokerage. We've built 4,000+ homes over 35 years in the Central Valley. We can tell you what fits on your lot, build it, and give you a realtor's view of what it may mean for your property. Any value discussion is a market opinion, not an appraisal.
Frequently asked questions
What's the most affordable ADU you build? Our ADU 256. At 256 sq ft it avoids both impact and school fees, and it works well as a rental studio, home office, or guest suite. We'll give you current pricing for your lot.
Which size makes the most sense? It depends on how you'll use it. For a rental or family space, plans from 495 to 730 sq ft give you one or two bedrooms and stay under the 750 sq ft impact-fee line. If you need three bedrooms, look at the 1,200 sq ft plans.
Why don't you list prices online? Material and labor costs change, and site work, utility connections, city fees, and finishes depend on your property. A posted price would be out of date or wrong for your lot. A free lot review gets you a current, honest number.
Can I build an ADU on my lot? Most single-family and multifamily lots in California can add one. California law lets you build a qualifying ADU without a public hearing, as long as it meets your city's written rules. Setbacks, utilities, and access still matter, so we check your property for free. See Build On Your Lot.
Does an ADU raise my property taxes? Only the new construction gets assessed. Your existing home's tax base stays the same.
Get a real number for your lot
A free, no-obligation lot review gives you an honest price for your property, not a guess. Call or text (559) 788-1000 or contact us. Tell us your city and what you're planning.
Ennis Builders &amp; Realtors &amp;middot; Porterville, CA &amp;middot; CSLB #950391 &amp;middot; DRE #01888871. Fee examples are illustrative and change over time. Fees and rules vary by city. This article is general information, not legal or tax advice.
 </description><pubDate>Thu, 01 Oct 2026 11:22:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/happy-thanksgiving</guid><link>http://www.ennisteam.com/blog/post/happy-thanksgiving</link><title>Happy Thanksgiving</title><description>Happy Thanksgiving from Ennis Builders &amp; Realtors. Be sure to give thanks and enjoy the time spent with loved ones.

#Thanksgiving#thankful#happythanksgiving</description><pubDate>Thu, 23 Nov 2023 00:00:05 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/thank-you-veterans-from-ennis-builders---realtors</guid><link>http://www.ennisteam.com/blog/post/thank-you-veterans-from-ennis-builders---realtors</link><title>Thank you Veterans from Ennis Builders &amp; Realtors.</title><description>#veteransday#thankaveteran#veteranappreciation</description><pubDate>Sat, 11 Nov 2023 00:00:45 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/thank-you-veterans-from-ennis-builders---realtors</guid><link>http://www.ennisteam.com/blog/post/thank-you-veterans-from-ennis-builders---realtors</link><title>Thank you Veterans from Ennis Builders &amp; Realtors.</title><description>#veteransday#thankaveteran#veteranappreciation</description><pubDate>Fri, 10 Nov 2023 14:32:17 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/there-is-no-greater-joy-than-to-have-an-endlessly-changing-horizon-for-each-day-to-have-a-new-and</guid><link>http://www.ennisteam.com/blog/post/there-is-no-greater-joy-than-to-have-an-endlessly-changing-horizon-for-each-day-to-have-a-new-and</link><title>"There is no greater joy than to have an endlessly changing horizon, for each day to have a new and different sun." – Christopher McCandless</title><description /><pubDate>Wed, 11 Nov 2020 11:30:26 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/install-a-shower-bench-and-make-your-showers-an-even-more-relaxing-experience</guid><link>http://www.ennisteam.com/blog/post/install-a-shower-bench-and-make-your-showers-an-even-more-relaxing-experience</link><title>Install a shower bench and make your showers an even more relaxing experience.</title><description /><pubDate>Tue, 10 Nov 2020 11:30:26 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/lake-braies-in-the-prags-dolomites-mountains-in-south-tyrol-italy</guid><link>http://www.ennisteam.com/blog/post/lake-braies-in-the-prags-dolomites-mountains-in-south-tyrol-italy</link><title>Lake Braies in the Prags Dolomites Mountains in South Tyrol, Italy</title><description /><pubDate>Mon, 09 Nov 2020 11:30:22 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/this-command-station-declutters-individual-documents-making-work-more-efficient</guid><link>http://www.ennisteam.com/blog/post/this-command-station-declutters-individual-documents-making-work-more-efficient</link><title>This command station declutters individual documents, making work more efficient.</title><description /><pubDate>Wed, 04 Nov 2020 11:30:15 -0700</pubDate></item><item><guid isPermaLink="true">http://www.ennisteam.com/blog/post/sierra-mars-marvelous-hillside-view</guid><link>http://www.ennisteam.com/blog/post/sierra-mars-marvelous-hillside-view</link><title>Sierra Mar's marvelous hillside view.</title><description /><pubDate>Tue, 03 Nov 2020 11:30:20 -0700</pubDate></item></channel></rss>